-
2008 August 23rd, 17:01
#1
mixing 30p/24p wiht 60i in the same premier pro project
I am editing with premier pro CS3. Does anyone know whether I can import and mix together clips in different formats (HDV24, HDV30, and HDV60) in the same project?
-
2008 August 23rd, 18:10
#2
Which Timeline Preset to use?
In the same project, if you have footages in 60i and 30p (or 50i and 25p), which timeline preset to be used?
Things to remember,
- 30p/25p footage can be edit in 60i/50i timeline no problem
- 60i/50i footage can be edit in 25p/30p but you need to deinterlace the 60i/50i footage. You can do so by right clicking the clip on timeline and choose "Field Options"
- For which timeline to use, pick the format with most of the footage frame rate you shot in. If the majority of footage is 60i/50i, then use a 60i/50i timeline.
- Or, you can think of what's your target output is. If it's for TV/DVD, 60i/50i timeline will be better. For computer/web, 30p/25p timeline will be bette
-
2008 August 23rd, 18:18
#3
Thank you very much for the guidelines.
I have a 60i "movie" - I want to add more video to it, but would like to shoot the new footage in 30p because I get better low-light performance.
Will I be able to easily add the new 30p clips to the 60i movie, in a 60i timeline preset?
Sorry to be so ignorant about this.
Rick.
-
2008 August 27th, 20:14
#4
How would 30p footage do in 24p settings for rendering? and vise versa (spl chk)?
-
2008 August 27th, 20:37
#5
Curmudgerator
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules